Fri. Nov 22nd, 2019

News

News Source – Area Control News

Border Wall Construction Process: Yuma, AZ 20190819 – 20190822

1 min read

Video of the construction process in Yuma, AZ for the New Border Wall. The process includes panel fabrication and delivery, demolition, soil conditioning to prepare soil for digging, trench digging, panel hoisting and installation.

Date: 08/19/2019 to 08/22/2019

Location: Yuma, AZ, about 12 miles east of the San Luis Port of Entry

Copyright © All rights reserved. Area Control News | Theme By | Newsphere by AF themes.
Source is part of the: Area Control Network